A load chart tells you the maximum permitted load for a truck crane in a specific setup and lifting position. To use it, match the crane’s configuration to the correct chart, find the capacity for the working radius and boom length, and compare that capacity with the total weight being lifted. The crane’s advertised maximum capacity alone does not tell you what it can lift on a particular job.
Truck cranes often have several load charts. Before reading a capacity, identify the chart for the actual configuration: the main boom or jib in use, outrigger extension, counterweight and any other conditions stated on the chart. Some capacities also depend on the direction of operation, such as working over the side or over the rear.
A capacity listed for fully extended outriggers cannot be used when the crane is set up on a permitted intermediate outrigger position. Likewise, fitting a jib can affect main-boom capacity even when the jib is stowed. Follow the chart notes and the manufacturer’s instructions for the configuration on the crane.
The chart assumes the crane is set up as specified. Outriggers need suitable support, and the crane must be level within the manufacturer’s limits. A chart capacity does not compensate for soft ground, inadequate outrigger mats or an incorrectly assembled machine.
Working radius is the horizontal distance from the crane’s center of rotation to the center of the suspended load. It is not the length of the boom. As the load moves farther from the crane, the available capacity generally decreases.
Find the radius row and the boom-length column on the applicable chart. Their intersection gives the rated capacity for those conditions. Check the units before comparing the figure with the load: charts may use different units for distance and weight.

Use the greatest radius the load will reach during the lift, including the position where it will be placed. Radius can change as the boom moves or deflects under load. If the planned radius or boom length falls between chart entries, follow the chart’s instructions for selecting a capacity; do not assume you can interpolate between values. If the required position is outside the chart’s permitted range, change the lift plan.
Boom angle can help establish the boom’s position, but it does not replace the radius reading unless the manufacturer’s instructions specifically use it that way. Also check the working-range diagram to establish whether the boom can physically reach the required height and position. Reach alone does not mean there is enough capacity to lift the load there.
The weight compared with the chart is often more than the weight marked on the item. Depending on the chart and configuration, deductions can include the hook block, slings, shackles, spreader beam and other lifting equipment. An attached or erected jib may also require a deduction under the manufacturer’s instructions.
For example, if a chart permits 8 tonnes at the planned radius and boom length, a 7.5-tonne item is not automatically within capacity. The hook block and rigging must also be accounted for. Apply the deductions specified on that chart, then compare the remaining capacity with the load. This example illustrates the arithmetic; it is not a capacity for a particular crane.
Use a known load weight, including anything secured to the item, such as shipping frames or contents. If the weight cannot be established, do not make the lift based on an estimate alone.
Load charts include limitations that are easy to miss when attention is fixed on the capacity table. Look for requirements on the number of parts of hoist line, permissible operating areas, boom extensions and equipment deductions. A capacity may be limited by the crane’s stability or by the strength of its components; a dividing line or other marking on the chart may distinguish the two.
Wind, sudden movements, side loading and lifting a load that is stuck or dragging can impose forces that the simple weight comparison does not capture. Follow the manufacturer’s operating limits and lift the load vertically and smoothly. The crane’s rated-capacity indicator is an aid, but it depends on correct setup information and does not replace reading the chart.
Before lifting, trace the planned movement from pickup to placement. If the radius, boom length, operating area or crane configuration changes along the way, check every affected position against the applicable chart. If any position exceeds the permitted capacity, revise the setup or lift plan before proceeding.